Factory Height
: 9m
Floor Design Loads
Production area (Ground Floor)
Office Area (Mezzanine Floor)
: 20KN/m²(Non Suspended Floor Slab)
: 2.5KN/m²
Roof Design Loads
Production Area Roof
: Imposed dead load = 0.25kN/m² (Load of Rafter,
Purlin, Metal Roofing Sheet, Insulation, Lighting
Fitting, Sprinkler Pipe & Gypsum Board Ceiling with
Aluminium Tee Frame) Live load= 0.25kN/m²
Roof System
Roof Structure
Roof Sheets
Gutter
: Structural Steel Designed to BS 5950 Standard
: Metal Roof or equivalent c/w 50mm thick fiberglass
insulation
: Stainless Steel Gutter
Walls
Internal Wall
(Office and Sprinkler Tank Area)
External Wall (Office Area)
External Wall (Production Area)
: 115mm thick common brick wall with plaster and
painted with emulsion paint
: Ceramic wall tiles to toilets (2.1m High)
: 115mm thick common brick wall with plaster and
painted with weather bond paint
: Brickwall and / or Precast Wall and painted with
weather bond paint
Floors
Ground floor
Production Finishes
Office & Lobby Finishes
Lobby Staircase Finishes
Toilet Floor Finishes
: G30 concrete with a layer of
polythene sheet and BRC mesh
: 4kg/m² floor harderner finishes
: Cement Render
: Cement Render
: Matt Surface Ceramic Tiles
Doors
External Doors
Internal Doors
: Motorized Roller Shutters and Mild Steel Doors
(Production Area)
: Tempered glass door (Entrance Area)
: Fire-rated Door (Based on local authority
requirement) & Timber Flush Door (Office Area)
Windows
External Windows
: Aluminium Frame Casement Window (Production Area)
: Reflective Glass Curtain Wall (Office Area)
: Aluminium Framed Top Hung Windows (Office Area)
Ceiling
Office Area
Production Area
: Gypsum Pin Hole False Ceiling
(Office Area)
: Gypsum Board Plaster Ceiling(Lobby Area)
: Exposed Steel Structure (No Ceiling)
Infrastructure Works
External Road
Fencing
Gate
Drainage System
Sewerage System
Bin Center
Guardhouse
Sprinkler Tank & Plinth
TNB Sub-station
Dock Leveller
: Front Signage : Common Brick Wall with c/w
plaster cement and painted with weatherbond
paint
: Perimeter : 150mm High Kerb with 1.8m High
BSP Fencing
: Sliding Gate Without Motor
: Power Point for Motor Provided
: Concealed Pipe Culvert Drain
: Vitrified clay pipe (VCP) connect to main
sewerage line
: 1 no.
: 1 no.
: 1 no.
: Subject to appropriate authority requirement
: Subject to design
STANDARD MECHANICAL & ELECTRICAL SPECIFICATION
MSB 1000A (setting 600A)
DB 150A
DB 60A
DB 30A
Lighting Point
13A S/S/O
Air-Cond Power Point
Emergency Light
Keluar Sign
Telephone Point
Data Point
20A Isolator Point
30A Isolator Point
: 1 no.
: 1 no.
: 2 nos.
: 1 no.
: Yes
: Yes
: Yes
: Subject to appropriate authority requirement
: Subject to appropriate authority requirement
: Yes
: Yes
: Yes
: Yes
FIRE PROTECTION SYSTEMS
Fire Alarm System
Hosereel System
Portable Fire Extinguisher
Hydrant System
: Yes
: Yes
: Yes
: Yes
: Yes
PLUMBING & WATER RECTICULATION SYSTEMS
Water Tank for Toilet only
Incoming Domestic Piping & Discharged Piping
: Yes
: Yes
Factory Height
9m
Floor Design Loads
Production area (Ground Floor)
20KN/m², Non Suspended Floor Slab
Office Area (Mezzanine Floor)
2.5KN/m²
Roof Design Loads
Production Area Roof
Imposed dead load = 0.25kN/m² (Load of Rafter, Purlin, Metal Roofing Sheet, Insulation, Lighting Fitting, Sprinkler Pipe & Gypsum Board Ceiling with Aluminium Tee Frame) Live load= 0.25kN/m²
Roof Structure
Structural Steel Designed to BS 5950 Standard
Roof Sheets
Metal Roof or equivalent c/w 50mm thick fiberglass insulation
Rain Water Down Pipe
Exposed 150mm ∅ UPVC, Pipe(Production Area), Concealed 150mm ∅ UPVC, Pipe(Office Area)
Gutter
Stainless Steel Gutter
Internal Wall (Office and Sprinkler Tank Area)
115mm thick common brick wall with plaster and
painted with emulsion paint, Ceramic wall tiles to toilets (2.1m High)
External Wall (Office Area)
115mm thick common brick wall with plaster and painted with
weather bond paint
External Wall (Production Area)
Brickwall and / or Precast Wall and painted with
weather bond paint
Floors
Ground Floor
G30 concrete with a layer of polythene sheet and BRC mesh
Production Finishes
4kg/m² Floor Hardener Finishes
Office & Lobby Finishes
Cement Render
Lobby Staircase Finished
Cement Render
Toilet Floor Finishes
Matt Surface Ceramic Tiles
External Doors
Motorized Roller Shutters and Mild Steel Doors (Production Area), Tempered Glass Door (Entrance Area)
Internal Doors
Fire-rated Door (Based on local authority requirement)
& Timber Flush Door (Office Area)
Windows
External Windows
Aluminium Frame Casement Window (Production Area)
Reflective Glass Curtain Wall (Office Area)
Aluminium Framed Top Hung Windows (Office Area)
Ceiling
Office Area
Gypsum Pin Hole False Ceiling (Office Area), Gypsum Board Plaster Ceiling (Lobby Area)
Production Area
Exposed Steel Structure (No Ceiling)
Infrastructure Works
External Road
Reinforced Concrete Road c/w road marking
Fencing
Front Signage : Common Brick Wall with c/w plaster cement and painted with weatherbond paint
Perimeter: 150mm High Kerb with 1.8m High BSP Fencing
Gate
Sliding Gate Without Motor, Power Point for Motor Provided
Drainage System
Concealed Pipe Culvert Drain
Sewerage System
Vitrified clay pipe (VCP) connect to main sewerage line
Bin Center
1 no.
Guardhouse
1 no.
Sprinkler Tank & Plinth
1 no.
TNB Sub-station
Subject to appropriate authority requirement
Dock Leveller
Subject to design
Standard Mechanical & Electrical Specification
MSB 1000A (setting 600A)
1 no.
DB 150A
1 no.
DB 60A
2 nos.
DB 30A
1 no
Lighting Point
Yes
13A S/S/O
Yes
Air-Cond Power Point
Yes
Emergency Light
Subject to appropriate authority requirement
Keluar’ Sign
Subject to appropriate authority requirement
Telephone MDP
Yes
Data Point
Yes
20A Isolator Point
Yes
30A Isolator Point
Yes
Fire Protection Systems
Fire Alarm System
Yes
Hosereel System
Yes
Automatic Sprinkler System (Ordinary Hazard)
Yes
Portable Fire Extinguisher
Yes
Hydrant System
Yes
Plumbing & Water Recticulation Systems
Water Tank for Toilet only
Yes
Incoming Domestic Piping & Discharged Piping
Yes